Lean construction is one of those evocative phrases that you hear getting thrown around a lot in industry circles. And yet, like the best of buzzwords, it’s unclear to what extent anyone actually knows what the heck it really means.
Don’t worry, though, we’ve got you covered.
In this article, we will explain what lean construction is and explore some of the history that led to its creation. Then we’ll sketch out some of the benefits of lean construction, dive into its core principles, and provide a few resources for those who want to learn more. Finally, we will cast a critical eye on what has become one of the most popular business strategies in the construction world.
The quick-and-dirty explanation is that lean construction is an approach to the business of building things that aims to minimize waste and maximize value for all stakeholders.
The idea is open to interpretation and has many different shades of meaning depending on where you approach it from. Some of its originators defined lean construction as:
“...a way to design production systems to minimize waste of materials, time, and effort in order to generate the maximum possible amount of value.”
But as pointed out in a 2018 paper on the subject: A single shared definition for lean construction has yet to be arrived at, and remains a bone of contention between academics focused on theoretic rigor and professionals who work in the field.
The weeds are definitely there to dive into, but we need not get lost in them…not yet, anyway. All you need to know for now is that lean construction is a guiding philosophy that seeks to improve every step of the building process, with particular focus on efficiency and the reduction of waste. Critically, this is achieved by changing the culture and having respect for the contributions of all involved.
Perhaps the most prominent examples of lean production in the building trade are offsite construction, as well as its offshoots, modular and prefabricated construction, all of which have successfully replicated the factory floor style manufacturing process of auto-companies.
Using a comprehensive project management system in concert with lean construction techniques can help deliver on the lean construction principles (e.g., improved project visibility, timeliness, and better outcomes).
Examples of lean construction tools and technology include:
As with big data, leveraging the copious quantities of project data available and, critically, connecting these data sources is key to delivering improved outcomes.
Lean construction first hit the scene in the 1990s. Its founders billed it as an alternative to “conventional construction”, which they characterized as a dysfunctional dynamic between siloed departments working at cross purposes.
Lean construction was inspired by the Just-In-Time (JIT) manufacturing method, which was itself influenced in part by Taylorism and Ford’s assembly lines.
Early Ford assembly line. Image source
JIT was pioneered by the Toyota car company in the first half of the 20th Century. Just one part of the Toyota Production System, JTT is often associated with the Toyota Production System. JIT is an efficiency-focused approach that can be summed up as making only "what is needed, when it is needed, and in the amount needed."
Image Source: WikiCommons
Renowned worldwide, JIT can now be found in industries across the globe, and has evolved into a popular inventory management strategy that aims to eliminate the need for safety stocks (resources held in reserve) by scheduling the arrival of materials and products “just in time” to meet customer demand.
Perfected in post-World War 2 Japan and widely implemented across Toyota’s auto-manufacturing plants during the oil crisis of the early 1970s, JIT’s focus on waste reduction, machine assisted workflows, and a continuous stream of process improvements (kaizen) sparked a revolution in thought about systems of production.
Having noticed Toyota’s success with the method, JIT began to take off in Western industries, eventually crystalizing into the idea of “lean manufacturing” in the 1990s.
The minting of “lean construction” as an idea came soon after and is widely credited to Lauri Koskela. A construction researcher based out of the United Kingdom, Koskela first wrote about the need for a paradigm shift in the world of construction in 1992.
For the early thinkers (namely Koskela, Glenn Ballard, Greg Howell, and Iris Tommelein), construction was in need of a coherent “theory of production” that focused on three primary elements: the transformation of materials into final products, the continuous and efficient flow of the construction process, and the creation of value for customers by eliminating as much waste as possible.
This theory of production was eventually given the name “lean construction.”
Lean construction aims to provide a blueprint for building professionals to predict the behavior of production systems and instill greater efficiency into their businesses. It is less a prescriptive set of concrete techniques and more a mindset that must be cultivated and practiced over time.
This lean construction mindset is built upon discrete principles that, proponents claim, can be transformed into practices that yield beneficial results. Building professionals who follow lean construction principles can, for example:
LCI’s model also includes showing respect for people, which increases ownership and transforms the culture.
That all sounds great, but what exactly are these principles of lean construction?
The concept of “leanness” is the subject of a wealth of writings online, most of which center on the importance of process improvements and waste removal.
A canonical set of lean construction standards remains a “work in progress” as Koskela et al. put it, but there are several different sources that outline helpful lean principles for building professionals to follow.
For example, in Chapter 4 of the book “Transforming Design and Construction”, the Lean Construction Institute lays out four core principles that practitioners of lean construction should adhere to:
Another oft circulated, albeit more generic set of lean principles can be found in the opening pages of the book “Lean Thinking” (1996) by James P. Womack and Daniel Jones.
We’ve adapted them below to fit into a more construction specific framework:
Understanding lean principles is one thing, figuring out how to operationalize it is another thing entirely. For those interested in clearing that hurdle, we’ve assembled a short list of helpful tools and resources:
Now that we have a clearer idea of what lean construction is, where it comes from, how it works, and how it can be introduced into the workplace, it’s time to take a look at some of the criticisms that have been leveled against it.
If you’re reading this in the early decades of the 21st Century, odds are that the lean mentality is all too familiar to you. “Doing more with less” has become the dominant axiom of our times, driving everything from healthcare administration to global economic policies. And as we’ve seen in recent years, the results aren’t always for the better.
Critical breakdowns in the global supply chain during the COVID-19 pandemic have largely been attributed to the failure of the Just-In-Time approach, prompting all kinds of industry players from healthcare to auto-manufacturing to reconsider their devotion to lean ideology.
To be clear, the globally embraced logic of efficiency that underlies “lean” and “do more with less” thinking has indeed led to increased productivity, as its originators claimed it would. The main problem, however, is that the cost of this increased productivity over the years has been thrown squarely on the shoulders of workers.
Nowhere is this cost more starkly illustrated perhaps than in the growing gap between productivity and pay. American workers in particular have never been more productive, and yet astonishingly, their wages have virtually plateaued since the 1980s. This gets at the root of many criticisms surrounding lean thinking: It prioritizes technical efficiency and the needs of industry over the health and safety of the human workforce.
The lean philosophy, critics argue, encourages industry leaders to cut corners and focus their search for waste in areas that inevitably harm workers. Flattened wages, layoffs, and lack of overtime pay are justified as cost-cutting measures–even when the company is experiencing record-breaking profits. Lengthened work days, shortened breaks, and the elimination of paid sick leave are introduced to squeeze more productivity out of an already over-extended workforce. Meanwhile, steep work quotas and employee tracking technologies are used to ensure that no time is wasted while on the job.
Are these examples of prudent waste removal? Or worker exploitation? The answer and the value you place upon it depends in large part on the angle from which you approach the issue.
Wherever you fall on the matter, questions about the human cost and the inherent tension between management and workers have been a part of the conversation around lean construction since the beginning.
Presented at the 7th conference of the International Group for Lean Construction in 1999, the paper “The Dark Side of Lean Construction” by Stuart D. Green, a professor of construction management, highlighted a variety of critiques; including the fact that the Just-In-Time method in Japan relied heavily on the exploitation of workers during a period of severely diminished labor rights.
Under the new lean regime of the 1970s, Japanese workers were often forced to work extremely long hours without days off. The successful introduction of lean production methods in the United States, Green argues, similarly relied on the disempowerment of American labor unions during the Reagan administration in the 1980s. While improvements have been made in recent years, the efficiency obsessed work culture in Japan grew so extreme over the ensuing decades that it birthed two new concepts to describe work-related stress: karoshi and karojisatsu, which translate respectively to “death by overwork” and “suicide by overwork.”
The human costs of overwork are hardly limited to Japan. A recently released study by the World Health Organization showed that overwork killed more than 745,000 people worldwide in 2016. The study went on to note that the stress from working more than 55 hours a week significantly increases the risk of stroke and heart disease; yet more than 488 million people worldwide routinely work well in excess of that amount. Overwork can also increase the rate of worker injuries by as much as 61%, another study found.
These kinds of outcomes are to be expected when critical thinking is jettisoned in favor of an excessive form of lean thinking that crowds out all other considerations. On the other hand, this could be due to improper application of lean principles, with many companies over the years having focused only on the tool side of the TPS while neglecting to understand the "people" side of the system.
We’ve said it before and we’ll say it again: above all else, safety must always be the number one priority in an occupation as hazardous as construction.
While the discipline associated with 5S, a lean tool, actually contributes to safety on jobsites, you have to wonder, is the selection and application of a few select tools that achieve short term wins or a systematic approach?
Lean construction has a lot to offer for those who are interested in making their businesses less wasteful and more efficient. There’s a reason why the lean strategy has been so widely embraced since its early days on the factory floors of the Toyota manufacturing plants. By adopting lean principles, construction professionals can make significant strides in understanding and improving upon the workflows that lead to the creation of value for clients.
It’s important, however, to never lose sight of the human element. At the core of LCI's lean tenets is "respect for people" Additionally, the Last Planner System is built around the belief of engaging the people close to the work to make decisions. Lean is truly a system that requires a disciplined approach to implement that can yield tremendous benefits to all involved. Just like in any other construction process, you have to build it in the right sequence.